Eriç HEPPs (282 MW)

19.06.2012



Hidro Dizayn has undertaken the project -consisting of a dam and three diversion weirs with four powerhouse buildings in total- that is tendered by Palmet Enerji AŞ. Within the scope of this project in Erzincan / Turkey, final and detailed design will be prepared and EM equipment tender, manufacturing, and installation consultancies will be performed.


<< Back