Client:
General Directorate of State Hydraulics Works
Project Location:
Kars
Working Time:
2013-2015
Installed Capacity:
89.12 m³/s
The project is located on the Herciki stream, 1.5 km east of the village of Varli, 6.0 km south of the district of Digor in Kars province. With the construction of the Dam, 1395 ha (gross) area,
1271,87 ha (net) area will be irrigated as a sprinkler + drip within the pressurized pipe system. And drinking water needs of the 13
villages in the vicinity will be met. Project purpose is irrigation and drinking water supply.
Services Offered
The following services were carried out under the project.
- Preliminary Report Preparation
- Geotechnical Report and Additional Studies
- Foundation Drilling Natural Construction
- Materials Tests Preparation of Interim Report
- Preparation of Detailed Design and Design
- Reports ofthe Project Preparation of the First Progress Report
- Preparation of the Second Progress Report
- Preparation of Expropriation Maps
- Reproduction of Project and Project Reports