Client:
MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş
Project Location:
Adana
Working Time:
2007-2012
Installed Capacity:
27.9 MW/55.0m³/s
It is a hydroelectric project on the Göksu river in Adana, tendered by the Ministry of Energy and Natural Resources with the build-operate-transfer model. It has a concrete weight type weir with a height of 21 m, a crest length of 33 m and controlled by 4 radial gates. With a total installed power of 27.9MW, 2 vertical axis Francis turbines can produce an annual average of 112 GWh with 55m gross head and 55m³/s flow rate.
Services Offered
- Review, appraisal and recommendations for feasibility study
- Preparation of geological evaluation report, seismic risk analysis report and electromechanical (E&M) equipment technical specification,
- Consultancy up to tender of (E&M) equipmet and civil works,
- Preparation of civil technical specifications, final design drawings, deıailed design drawings and as-built drawings,
- Consultancy and owner’s engineering services for (E&M) equipment.