Çarşamba Weir & HPP, Turkey

Çarşamba Weir & HPP, Turkey2024-06-06T11:51:12+03:00







Client:
Çarşamba Enerji Elektrik Üretim A.Ş
Project Location:
Samsun
Working Time:
2008-2013
Installed Capacity:
11.778MWm/210m3/s



This is a BO project licensed by the Ministry of Energy and Natural Resources (MENR). The weir is 5.6 m high above foundation with 170 m crest length. The powerhouse is a reinforced concrete structure with three vertical axis Kaplan type turbines, and installed capacity of each unit is 3.926 MWm

Services Offered
  •  Preparation of feasibility report
  •  Preparation of final design reports and drawings
  •  Preparation of detailed construction drawings for project structures