Client:
Avkal Enerji Üretim ve Ticaret A.Ş.
Project Location:
Amasya
Working Time:
2011 - 2013
Installed Capacity:
36MW/110.0m3/s
Kale Weir and HPP is a hydropower scheme located on Yeşilırmak River in Amasya province, in Middle Black Sea region of Turkey. It is licensed by the Energy Market Regulatory Authority (EMRA). The concrete lined section of the power tunnel is 4,103 m long, and Ø6.05m in diameter. The remaining 158m is steel lined and followed by a valve chamber. A 6m diameter penstock connects the valve chamber to the bifurcation point. At the bifurcation point, the penstock is divided into three branches with a diameter of 3.10m.
Services Offered
- Preparation of revised feasibility report
- Programming site investigations and evaluation of the works
- Preparation of final design, reports and drawings
- Preparation of technical specifications and tender documents
- Preparation of detailed (construction) design drawings and reports.