Yamula Project Kalaba-Seyfe Group Irrigation Planning, Turkey

Yamula Project Kalaba-Seyfe Group Irrigation Planning, Turkey2024-06-06T12:00:39+03:00







Client:
General Directorate of State Hydraulic Works
Project Location:
Kayseri
Working Time:
2004 - 2006



The project has 110 422 ha gross irrigation area where all water demand is supplied from existing Yamula Dam by pumping inside of Kayseri, Kırşehir, Nevşehir and Yozgat province. The Yamula Dam is a 115 m high. The total capacity of 22 nos of pumps are 93.16 MW. The water conveyance consists of 6285.88 m tunnel and7283.50 m channel. The required annual pumping energy is about 221.90 GWh/year.

Services Offered
  • Preparation of planning report and drawings
  •  Preparation of geotechnical report
  • Preperation of land acquisition report
  •  Preperation of agriculture pattern change report
  •  Preparation of soil classification report for irrigation
  • Preperation of environmental impact assessment report
  • Preperation of agricultural economy report
  •  Preperation of drainage of irrigation area report