Client:
Acacia Mining Operations
Project Location:
Kastamonu
Working Time:
2020-2022
Installed Capacity:
-
The purpose of the Bağdere Tailings Dam which is planned to be carried out by Acacia Mining Operations is to provide storage for the copper mine and mineral processing plant wastes in order not to cause any environmental damages.
Services Offered
- Preliminary Report,
- Hydrology Report,
- Geological-Geotechnical Survey Program,
- Geotechnical Calculation Report,
- Quantity Survey Report,
- Detailed Design Drawings