Client:
JSC NENSKRA
Project Location:
Svaneti, Georgia
Working Time:
2012 - 2015
Installed Capacity:
210MW
Nenskra HPP is a high head hydroelectric project with an installed capacity of 210 MW and located on the Nenskra river in the Svaneti region of north-western Georgia.
Main Project Data
Dam Type and Height: Asphalt-Core Rockfill, 130 m
Concrete Lined Headrace Tunnel: 15,100 m
Tunnel between Nankra Weir and Reservoir: 12,400 m.
Installed Capacity: 210 MW
Annual energy generation: 1,194/927GWh
Services Offered
- Preparation of Detailed Design based on previously performed Feasibility study and Initial Design.
- Phase 1: Execution of Geological and Geotechnical Investigations and Preparation of the Geological & Geotechnical Report
Phase 2: Detailed Design Services;
- Review of Tender Design
- Preparation of Due Diligence Report
- Civil works for Nenskra: Headrace Tunnel (TBM tunnels) and Adits incl. Plugs, Surge Shaft, Pressure Shaft, Gate Chamber and Roads.
- Civil works for Nakra: Tunnel (TBM Tunnel) and Roads.