
Client:
Çalık Enerji Sanayi ve Ticaret A.Ş.
Project Location:
Georgia
Working Time:
2014 - 2016
Installed Capacity:
57+1.70MWm/140m³/s
The Sadmeli Project is located on the Rioni River in between Oni and Ambrolauri cities. The Project is consist of a dam with 25.5 m height from thalweg, an energy tunnel with 6.8 m diameter and 13250 m length which receives the Lukhunis and Ritseula tributaries and a hydroelectric power house with 148.7 MW capacity near city of Sadmeli.
Services Offered
- Water Potential and Energy Generation Calculations
- Preparation of Pre-Feasibility Report and Feasibility Report
- Topographical and Mapping Services
- Design of all Project Components according to Hydraulic and Stability Calculations
- Geological and Geotechnical Investigations and Preparation of related Reports
- Construction Planning and Preparation of Methodology Report
- Preparation of Resettlement Action Plan (Expropriation) Reports
- Preparation of ESIA Reports
- Bill of quantities and overall cost estimate
- Determination of rantability of the Project based on economic analysis.