The aim is to determine and design the most suitable project formulation for the effective irrigation of agricultural lands in the Andkhoi region, whose livelihood is based on agriculture. Andkhoi City currently uses the water potential of Shirin Tagap River. However, Shirin Tagap River is almost drying up around Andkhoi and it is not possible to make an effective agriculture with this water potential. For this reason, the water potential of the Ceyhun River, which passes through the Afghanistan-Turkmenistan-Uzbekistan border line from the north of the Project area, will be utilized.
Main Data;
– Total Irrigation Area: 44,563 ha
– Irrigation Type: Gravity and Pumped
– Project Discharge: 54 m3/s
– Irrigation Area – Gravity: 5,571 ha
– Irrigation Area – Pumped: 38,992 ha
– P1 Pump Capacity: 48.82 m3/s
– P1 Installed Power: 15 x 1,400 kW
– P2 Pump Capacity: 18.59 m3/s
– P2 Installed Power: 6 x 1,400 kW
- Pre-feasibility report
- Feasibility report
- Preparation of Final Design drawings
- Preparation of Tender Documents
- Topographic survey
- Geological and geotechnical investigations
- Soil classification
- Environmental and Social Impact Assessment
- Capacity Development program for the Client’s personnel