Bucakkışla Weir & HPP, Turkey

Bucakkışla Weir & HPP, Turkey2024-06-06T11:55:11+03:00







Client:
Yapısan Electricity Generation Inc.
Project Location:
Adıyaman
Working Time:
2010-2014
Installed Capacity:
34.54MW / 38.70m3/s



The project is located on Göksu River. The weir height is 25.0 m. The crest elevation is 406.50 masl with 64m crest length. Power tunnel length is 4,555 m with 4.50 m diameter.

Services Offered
  • Preparation of feasibility report.
  • Preparation of final and detailed design drawings and reports of civil, electric, plumbing and hydro mechanic works.