Client:
Acacia Maden İşletmeleri A.Ş.
Project Location:
Kastamonu
Working Time:
2013-2015
Installed Capacity:
-
The purpose of the project is to provide dry working environment for enabling a large open-pit excavation on the river bed. Upstream & downstream cofferdams with deep slurry trenches down to 46m in the alluvium assures stability of the clay cored (zoned) rockfill embankments. A 70m wide uncontrolled spillway has a discharge capacity of 10,000-Year Flood, together with the diversion tunnels.
Services Offered
- Technical Report (Planning Phase),
- Hydrology Report,
- Geological and Geotechnical Survey Program,
- Geotechnical Report (Stability, settlement and deformation analysis),
- Transportation & Service Roads and Infrastructure Report,
- Final Design and Tender Documents,
- Civil, Mechanical and Electrical Works Technical Specifications,
- Civil, Mechanical and Electrical Detailed Design Drawings.