
Client:
77 Construction USA Corp.
Project Location:
Musa Qala – Zamin Davor, Afghanistan
Working Time:
2018 - Ongoing
Within the scope of Helmand River Basin Development Project, it is aimed to irrigate agricultural area of Musa Qala and Zamin Davor regions.
The dam which is constructed on the Musa Qala river will irrigate the agricultural area of Musa Qala region. Dam and irrigation facilities are under the design stage.
The agricultural area of the Zamin Davor region will be irrigated with pumping system using the tailwater potential of the Kajaki Dam. Irrigation and pumping facilities are under the design stage.
Main Data:
Musa Qala Dam and Irrigation Project:
Dam Type: Clay Core Rock fill Dam
Height from thalweg: 61 m
Total Irrigation Area: 10,695 ha
Zamin Davor Irrigation Project
Total Irrigation Area: 25,000 ha
Services Offered
- Preparation of Pre-Feasibility Report
- Preparation of Feasibility Report
- Preparation of Detailed Design