Client:
77 Construction USA Corp.
Project Location:
Kandahar, Afghanistan
Working Time:
2016
Installed Capacity:
51MW+2x25MW
The Kajaki Dam and HPP is located on the Helmand River 100 miles (161 km) north-west of Kandahar City. The powerhouse is designed with 3 units vertical Francis type turbines each have 16.50MW capacities. New feasibility offers a two stage increase in total installed capacity; firstly from 51 MW to 101 MW, and with addition of 2×25 MW, ultimately a total 151 MW is studied.
Services Offered
- Preparation of Pre-Feasibility Report
- Preparation of Feasibility Report
- Preparation of E&M Technical Specifications