Client:
Şekerbank T.A.Ş.
Project Location:
Turkey
Working Time:
08/2019 – 12/2019
Installed Capacity:
103.8 MW/167 m³/s
Hydrology Assessment Report for Kargı Dam and HPP Project, which is located on Kızılırmak River with a drainage area of 60 560 km², was prepared. In the scope of this report, inflow series of Kargı Dam were calculated taking into consideration both current and developed conditions of the basin.
Services Offered
- Determination of Streamflow Gaging Stations
(SGS) - Calculation of upstream consumptions of SGSs
- Obtaining natural flow series of SGSs
- Estimation of missing data in the flow series using regression analysis
- Identification of all facilities and their characteristics within the basin
- Calculation of natural flow series at locations of facilities
- Calculation of upstream consumptions of facilities
- Calculation of inflow series of facilities
- Conducting reservoir operation studies from upstream to downstream
- Calculation of inflow series of Kargı Dam for both current and developed condition in the basin