
Client:
Ak-El Kemah Elektrik Üretim A.Ş. (Akenerji subsidiary)
Project Location:
Erzincan
Working Time:
2012- 2015
Installed Capacity:
139.94 MWm + 58.7MWm
The Project is located on the Karasu River within the boundary of Erzincan province, in the east of Turkey.
Kemah Dam and HEPP Project is planned to develop 100m gross head on the Firat River. The project consists of two phases, a dam with a head of 71 m in the Euphrates valley on the upstream side and a second facility (River Type Hydroelectric Power House) to utilize the remaining 29 m head down 8km from this dam.
Services Offered
- Review and acceptance of full set of documents provided by the Client
- Preparation of Scope of Work and RfPs for Site Investigations, Management of Investigation Works
- Preparation of Engineering Geology Report
- Value Engineering Report
- Basic Design (Tender Drawings)
- FIDIC based tender documents preparation for Civil, H/M and E/M works
- Reservoir Operation studies for both Pump Storage and Conventional Powerhouse options
- Preparation of Tender Documents (drawings, specifications and reports) for pump storage alternative based on the abovementioned Value Engineering Report