Client:
Acacia Mining Operations
Project Location:
Karaman
Working Time:
2015 - 2019
Installed Capacity:
-
The purpose of the Kepezkaya Tailings Dam which is planned to be carried out by Acacia Mining Operations is to provide storage for the copper mine and mineral processing plant wastes in order not to cause any environmental damages.
Services Offered
- Preparation of Preliminary Report, Hydrology Report, Geological and Geotechnical Survey Program,
- Preparation of Engineering Geology and Natural Construction Material Report, Geotechnical Calculation (Stability, settling and deformation) Reports
- Preparation of Hydrogeological Research Program, Hydrogeology Report, Access & Service Roads and Engineering Structures Report,
- Introducing the project and preparation of the Project Report,
- Seepage Water Drainage System Report, Hydraulic, Static and Reinforced Concrete Calculations,
- Preparation of Mechanical and Electrical Equipment and Installation Report
- Quantity Survey Works,
- Machine Park, Work Schedule and Site Facility Report,
- Preparation of Seismic Hazard Analysis Report, Active Fault Research Report,
- Preparation of Civil, Mechanical and Electrical Detailed Design Drawings,
- Preparation of Civil, Mechanical and Electrical works Technical Specifications,
- Preparation of Administrative Specifications and Contract Documentations.
- Site Supervision Consultancy Services