Oni Cascade Project, Georgia

Oni Cascade Project, Georgia2024-06-06T12:09:26+03:00







Client:
JSC Partnership Fund
Project Location:
Oni, Georgia
Working Time:
03/2013 – 07/2013
Installed Capacity:
Oni 1: 2x62.50MW/2x21m3/s, Oni 2: 3x45.9 MW/3x33.33 m³/s, Garula: 2x6.20MW/2x15m³/s



Oni Cascade composes of Oni 1 Arch-gravity Dam (100 hm³ reservoir capacity), Oni 2 Diversion Weir on Rioni Main River and two tributary contribitions Garula and Jejora weirs. The project location is immediately downstream of Oni Town Georgia.

Services Offered
  •  Review of the Feasibility Report which requires a detailed analysis of the Feasibility Study in order to identify its compliance with internationally recognized best practices to be exercised for the feasibility study reports of the project
  •  Review of civil, electrical, and mechanical design considerations to verify that the final layout and design as agreed between the designer, the Client and the Ministry of Energy responds to the requirements with respect to project cost and duration