Paravani Weir & HPP, Georgia

Paravani Weir & HPP, Georgia2024-06-06T12:08:25+03:00







Client:
Georgian Urban Energy Ltd.
Project Location:
Samstkhe/Javakheti, Georgia
Working Time:
2011 - 2014
Installed Capacity:
86.54MW/25 m³/s



This is the FIRST HEPP Project Owned by Turkish Investors Abroad.
Georgia’s facility, built on the Paravani River in Samstkhe – Javakheti Province, transfers 3/4 of the produced energy to Turkey, following a special agreement signed between Turkey and Georgia. All engineering and consultancy services from the Feasibility stage to the commissioning of Paravani HEPP Facilities, which is a Build-Operate-Transfer Project licensed by the Georgian Ministry of Energy, were performed by Hidro Dizayn.

Characteristics of the Project :
Tunnel Diameter / Length: 3.5m / 14,179m
Powerhouse:
Nos./type of turbines: 2/Francis, vertical axis
Rated capacity/rated discharge (total): 86.54MW/25 m3/s
Net head: 425.80 m
Total average energy production: 409.03 GWh/a
Penstock diameter & length: 2.50 m / 1,050m

Services Offered
  •  Review of Feasibility and Initial (Final) Design
  •  Revision of Final Design Drawings
  •  Preparation of Detailed (Construction) Design Civil Drawings
  •  Owner’s Engineering Services
  •  Site Supervision with a team of 40 staff
    (undertaken by HİDROLİN)