Client:
State Hydraulic Works 3rd Regional Directorate
Project Location:
Sakarya/Eskişehir
Working Time:
2013 - 2018
In the context of the project, Basin water potential and quality, land usage, land resources, water consumption and demand is determined and then water budget is set. Analyzing technical, economic and environmental feasibility in general terms constitutes the purpose of the studies. Preparation of the Basin Master Plan Report was carried out in cooperation with the partners and their shares are: Hidro Dizayn Engineering Consultancy Inc. Co. 55% – NFB Engineering Consultancy Ltd. Co. 45%.
Services Offered
- Basin Hydrology Report, Hydrogeological Report,
- Basin Land Evaluation and Drainage Report,
- Basin Water Consumption Report, Agricultural Economy Report,
- Basin Environment and Water Quality Report,
- Basin Flood and Sediment Control Report,
- Basin Master Plan Report