Client:
Yedigöze Elektrik Üretim ve Ticaret AŞ (Sanko A.Ş.)
Project Location:
Adana
Working Time:
2007-2010
Installed Capacity:
318.0 MW/187.5 m3/s
This is a BOT project which is tendered by Ministry of Energy and Natural Resources having Hydropower purpose which is located on Seyhan River in Adana province. The dam is 130 m high above foundation with 412 m crest length. The embankment is zoned rock-fill with concrete facing on upstream side, impounding a total volume of 643 million m³ in the reservoir. There are two generating units with vertical axis francis type turbines, and installed capacity of total unit is 317 MW, 96 m gross head and 187.5 m³/s discharge, the facility could produce 942,82 GWh total energy per year.
Services Offered
- Review, appraisal and recommendations for feasibility study
- Programming site investigations and evaluation of the works
- Preparation of final design reports and drawings
- Preparation of technical specifications and tender documents
- Preparation of detailed design drawings for civil works
- Assisting the Client in evaluation of E&M bid documents
- Verification of detailed design drawings of hydro-mechanical and electro-mechanical equipment
- Site supervision before and during installation of E&M and H&M equipment, monitoring acceptance tests and supervision of commissioning of equipment & plant