Sarıgüzel Dam & HPP, Turkey

Sarıgüzel Dam & HPP, Turkey2024-06-06T11:44:15+03:00







Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Project Location:
Kahramanmaraş
Working Time:
2007-2014
Installed Capacity:
100.80MWm+3.76MWm/101m3/s



The dam type is Concrete Face Rockfill Dam (CFRD) which is 94 m high above foundation with 463.5 m crest length. Two diversion conduits are located at the right bank with 4.50 m inner diameter and 330 m in length. A power tunnel of 6.00 m inner diameter and 5457 m long goes on to the valve chamber from the power intake structure and a penstock of diameter 5.00 m and 85 m long goes down to bifurcation from the valve chamber. Total annual energy production of the current situation is 311.763 GWh.

Services Offered
  • Preparation of feasibility design report and drawings
  • Preparation of final design reports and drawings
  • Preparation of technical specifications
  • Preparation of detailed (construction) design drawings and reports
  • Programming site investigations and evaluation of the works
  • Day-to-day site supervision services to the owner during site construction & commissioning works