Client:
IHE Ivoire Hydro Energy SA
Project Location:
Abidjan, Ivory Coast
Working Time:
2014-2015
Installed Capacity:
44MW
Singrobo HPP Project is located on the Bandama river, about 148,50 km by road from Abidjan, the commercial city of Cote d’Ivoire and about 23 km down steam of the existing Taabo Dam. The proposed project site is located 3,5 km from Singrobo Village in the Lagunes District. The project site is well connected to Abidjan. Main Project components are river diversion, main dam, grout curtain, spillway, powerhouse, switchyard and access roads.
Main project characteristics;
Dam Body Type: Clay Core Rockfill Dam
Height from Found.: 32.50 m
Crest Length : 1246.74 m
Installed Capacity : 44 MW
Services Offered
- Topographical Surveying Works
- Geological and Geotechnical Investigations
- Preparation of Feasibility Report
- Preparation of Tender (Final) Drawings and calculations
- Preparation of EPC Tender Documents including all Technical Specifications
- Evaluation of technical proposals of bidders. Consultancy and support during bidding phase
- Hydropower Impact Analysis
- Dam break analysis and related studies