Yokuşlu-Kalkandere HPP, Turkey

Yokuşlu-Kalkandere HPP, Turkey2024-06-06T11:49:38+03:00







Client:
Sanko Holding
Project Location:
Rize
Working Time:
2007-2010
Installed Capacity:
35.79 MW/50.0 m³/s



This is a BO project licensed by the Ministry of Energy and Natural Resources (MENR). A power tunnel of 4.00 m inner diameter and 6927.0 m long goes on to Surge tank 15m diameter and 100 m length. The Project has powerhouse that consists 3 horizontal axis francis turbines, and installed capacity is 11.93 MW each.

Services Offered
  •  Review, appraisal and recommendations for feasibility study
  • Programming site investigations and evaluation of the works
  • Preparation of final design reports and drawings
  • Preparation of technical specifications
  •  Preparation of detailed (construction) design drawings and reports