Client:
Ministry of Energy and Water (MEW) represented by KfW Bankengruppe, Frankfurt am Main
Time of work:
2013 - 2018
Installed Capacity:
2 x 11.4 MW
Category
Client:
Chenab Valley Power Projects Private Ltd.
Time of work:
2015 - 2016
Installed Capacity:
1x18.5MW/2x16.50m³/s
Category
Client:
Chenab Valley Power Projects Private Ltd
Time of work:
2014
Installed Capacity:
1000MW/2x155.75m³/s
Category
Client:
Kheledula Energy LLC (Anadolu Grubu)
Time of work:
2015 - 2020
Installed Capacity:
51.43MW/26 m³/s
Category
Client:
Çalık Energy Industry and Trade Inc.
Time of work:
2014 - 2016
Installed Capacity:
58MWm/160m³/s
Category
Client:
Çalık Enerji Sanayi ve Ticaret A.Ş.
Time of work:
2014 - 2016
Installed Capacity:
57+1.70MWm/140m³/s
Category
Client:
Achar Energy 2007 Ltd.
Time of work:
2013 - 2014
Installed Capacity:
28.92MW/450 m³/s
Category
Client:
Optimum Energy Generation Corporation
Time of work:
2012 - 2013
Installed Capacity:
8.77MWm/7.2m³/s
Category
Client:
Optimum Enerji Üretim A.Ş.
Time of work:
2011 - 2014
Installed Capacity:
22.20MW/17,00 m³/s
Category
Client:
Engurihesi Ltd. (Joint Venture with Lahmeyer International)
Time of work:
2017 - Ongoing
Installed Capacity:
1300MW/450m³/s
Category
Client:
Betaş Elektrik Taahhüt & Ticaret A.Ş.
Time of work:
2021 - Ongoing
Installed Capacity:
-
Category
Client:
Betaş Elektrik Taahhüt & Ticaret A.Ş.
Time of work:
2015 - 2017
Installed Capacity:
-
Category
Client:
Achar Enerji 2007 Ltd. (Eksim Yatırım Holdingi A.Ş.)
Time of work:
2013 - 2014
Installed Capacity:
-
Category
Client:
JSC Partnership Fund
Time of work:
03/2013 – 07/2013
Installed Capacity:
Oni 1: 2x62.50MW/2x21m3/s, Oni 2: 3x45.9 MW/3x33.33 m³/s, Garula: 2x6.20MW/2x15m³/s
Category
Client:
International Finance Corporation (IFC) - Adjaristsqali Georgia LLC / Georgia (Together with Lahmeyer International)
Time of work:
2013 - 2017
Installed Capacity:
175MW
Category
Client:
Georgian Urban Energy Ltd.
Time of work:
2011 - 2014
Installed Capacity:
86.54MW/25 m³/s
Category
Client:
Sanayi ve Elektrik Bakanlığı Kürdistan Bölge Valiliği ERBİL IRAK
Time of work:
06-2005/11-2005
Installed Capacity:
32MW
Category
Client:
Acacia Mining Operations
Time of work:
2015 - 2019
Installed Capacity:
-
Category
Client:
Eti Maden İşletmeleri General Directorate
Time of work:
2013 - 2014
Installed Capacity:
-
Category
Client:
Eti Maden İşletmeleri General Directorate
Time of work:
2013 - 2014
Installed Capacity:
-
Category
Client:
Şekerbank T.A.Ş.
Time of work:
08/2019 – 12/2019
Installed Capacity:
103.8 MW/167 m³/s
Category
Client:
Türkiye İş Bankası A.Ş.
Time of work:
2011 – 2014
Installed Capacity:
37.50 MW/9 m³/s
Category
Client:
Yapı Kredi Bankası A.Ş.
Time of work:
2015 - 2017
Installed Capacity:
5.78 MW / 11 m³/s
Category
Client:
General Directorate of State Hydraulic Works
Time of work:
2015 - 2018
Installed Capacity:
-
Category
Client:
State Hydraulic Works IV. Regional Directorate, Konya
Time of work:
2017 - Ongoing
Category
Client:
Devlet Su İşleri XXII. Bölge Müdürlüğü
Time of work:
2014 - 2016
Installed Capacity:
24.241 ha
Category
Client:
General Directorate of State Hydraulic Works
Time of work:
2005 - 2011
Installed Capacity:
5079 ha
Category
Client:
Ministry of Agriculture and Forestry, General Directorate of Water Management
Time of work:
2016 - 2019
Category
Client:
Akenerji Elektrik Üretim A.Ş.
Time of work:
2005 - 2010
Installed Capacity:
82.86 MW /12.30 m3/s
Category
Client:
Avkal Enerji Üretim ve Ticaret A.Ş.
Time of work:
2011 - 2013
Installed Capacity:
36MW/110.0m3/s
Category
Client:
Yapısan Elektrik Üretim A.Ş.
Time of work:
2007 - 2009
Installed Capacity:
99 MW/36.0 m3/s
Category
Client:
Akım Enerji Üretim San. Tic. AŞ (Sanko Energy Group Firm)
Time of work:
2005- 2010
Installed Capacity:
95 MW/49.50 m3/s
Category
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2010-2013
Installed Capacity:
8.32MW/64.8m3/s
Category
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2007-2013
Installed Capacity:
45 MW/20.0m3/s
Category
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2007-2011
Installed Capacity:
144.40MW/120.26m3/s
Category
Client:
Yapısan Electricity Generation Inc.
Time of work:
2010-2014
Installed Capacity:
34.54MW / 38.70m3/s
Category
Client:
MEM En. El. Ür. San. ve Tic. AŞ
Time of work:
2007-2010
Installed Capacity:
7.03MW / 5.2 m3/s
Category
Client:
İyon Enerji Üretimi Sanayi ve Ticaret A.Ş. (Sanko Energy Group )
Time of work:
2008-2014
Installed Capacity:
37.02MW/16.0m3/s
Category
Client:
Çarşamba Enerji Elektrik Üretim A.Ş
Time of work:
2008-2013
Installed Capacity:
11.778MWm/210m3/s
Category
Client:
MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş
Time of work:
2007-2012
Installed Capacity:
27.9 MW/55.0m³/s
Category
Client:
Akkur Enerji Üretim Ticaret ve Sanayi AŞ
Time of work:
2007-2010
Installed Capacity:
71.4 MW/127.5m3/s
Category
Client:
Zorlu Doğal Elektrik Üretimi A.Ş.
Time of work:
2015 - 2018
Installed Capacity:
25.78 MWm+24.94 Mwe
Category
Client:
General Directorate of State Hydraulics Works
Time of work:
2009 – 2010
Installed Capacity:
-
Category
Client:
General Directorate of State Hydraulics Works
Time of work:
2013-2015
Installed Capacity:
89.12 m³/s
Category
Client:
State Hydraulics Works (DSI), 2nd Region
Time of work:
2011 – 2016
Installed Capacity:
-
Category
Client:
Statkraft Inc., Norway, (Kargı Kızılırmak Enerji A.Ş.)
Time of work:
2011-2013
Installed Capacity:
103.8 MW/167 m3/s
Category
Client:
Enerjisa Enerji Üretim A.Ş.
Time of work:
2012-2013
Installed Capacity:
172MW/137.5m3/s
Category
Client:
Akkur Enerji Üretim Ticaret ve Sanayi A.Ş. (Akenerji subsidiary)
Time of work:
2007- 2010
Installed Capacity:
27.90 MW/33.20m3/s
Category
Client:
MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş (Akenerji subsidiary)
Time of work:
2007-2012
Installed Capacity:
29.46 MW/51.0 m³/s
Category
Client:
Ak-El Kemah Elektrik Üretim A.Ş. (Akenerji subsidiary)
Time of work:
2012- 2015
Installed Capacity:
139.94 MWm + 58.7MWm
Category
Client:
Ark Enerji A.Ş. (Sanko A.Ş.)
Time of work:
2011 – 2015
Installed Capacity:
68.85MWm/213.0 m3/s
Category
Client:
Çetin Enerji A.Ş. (Statkraft)
Time of work:
2013 – 2017
Installed Capacity:
420 MW/ 347.2 m3/s
Category
Client:
Yedigöze Elektrik Üretim ve Ticaret AŞ (Sanko A.Ş.)
Time of work:
2007-2010
Installed Capacity:
318.0 MW/187.5 m3/s
Category
Client:
Kayseri Elektrik Üretim Sanayi ve Ticaret A.Ş.
Time of work:
2002-2005
Installed Capacity:
100 MW/103.20 m3/s
Category
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2007-2014
Installed Capacity:
100.80MWm+3.76MWm/101m3/s
Category
Client:
Energo-Pro (BİLSEV Enerji Üretim ve Ticaret A.Ş.)
Time of work:
2015-2020
Installed Capacity:
99.50 MWm
Category
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2007-2014
Installed Capacity:
206.60MWm + 4.88MWm/107.7m3/s
Category
Client:
Energo-Pro (Murat Nehri Enerji Üretim A.Ş.)
Time of work:
2017 - 2020
Installed Capacity:
2x110 + 2x30 MW
Category