References

References

2024-06-14T10:06:48+03:00

Kategoriler
Değerlendirme
Nachtigal HPP, Cameroon
Client:
Tractebel Engineering S.A.
Time of work:
2018-Ongoing
Installed Capacity:
420MW
Category
Singrobo-Ahouaty HPP, Ivory Coast
Client:
IHE Ivoire Hydro Energy SA
Time of work:
2014-2015
Installed Capacity:
44MW
Category
Expo Astana 2017 Project, Kazakhstan
Client:
Sembol İnşaat A.Ş.
Time of work:
2014
Installed Capacity:
-
Astana New Railway Station, Kazakhstan
Client:
Sembol Construction Inc.
Time of work:
2014
Installed Capacity:
-
Feasibility Study of Andkhoi Irrigation Project...
Client:
Ministry of Agriculture Irrigation and Livestock
Time of work:
2018-2020
Category
Mahipar and Sarobi HPPs, Afghanistan
Client:
Ministry of Energy and Water (MEW) represented by KfW Bankengruppe, Frankfurt am Main
Time of work:
2013 - 2018
Installed Capacity:
2 x 11.4 MW
Category
Kajaki HPP 2nd Unit Assemblage, Afghanistan
Client:
Chenab Valley Power Projects Private Ltd.
Time of work:
2015 - 2016
Installed Capacity:
1x18.5MW/2x16.50m³/s
Category
Helmand River Basin Development Project, Afghan...
Client:
77 Construction USA Corp.
Time of work:
2018 - Ongoing
Category
Kajaki Dam & HPP Upgrade, Afghanistan
Client:
77 Construction USA Corp.
Time of work:
2016
Installed Capacity:
51MW+2x25MW
Category
PAKAL DUL (Drangdhuran) Dam & HPP, India
Client:
Chenab Valley Power Projects Private Ltd
Time of work:
2014
Installed Capacity:
1000MW/2x155.75m³/s
Category
Kheledula 3 HPP, Georgia
Client:
Kheledula Energy LLC (Anadolu Grubu)
Time of work:
2015 - 2020
Installed Capacity:
51.43MW/26 m³/s
Category
Alpana Project, Rioni River, Georgia
Client:
Çalık Energy Industry and Trade Inc.
Time of work:
2014 - 2016
Installed Capacity:
58MWm/160m³/s
Category
Sadmeli Project, Rioni River, Georgia
Client:
Çalık Enerji Sanayi ve Ticaret A.Ş.
Time of work:
2014 - 2016
Installed Capacity:
57+1.70MWm/140m³/s
Category
Khelvachauri-II Weir & HPP, Georgia
Client:
Achar Energy 2007 Ltd.
Time of work:
2013 - 2014
Installed Capacity:
28.92MW/450 m³/s
Category
Arakali Weir & HPP, Georgia
Client:
Optimum Energy Generation Corporation
Time of work:
2012 - 2013
Installed Capacity:
8.77MWm/7.2m³/s
Category
Abuli Weir & HPP, Georgia
Client:
Optimum Enerji Üretim A.Ş.
Time of work:
2011 - 2014
Installed Capacity:
22.20MW/17,00 m³/s
Category
Enguri HPP, Georgia
Client:
Engurihesi Ltd. (Joint Venture with Lahmeyer International)
Time of work:
2017 - Ongoing
Installed Capacity:
1300MW/450m³/s
Category
Tskaltubo 500 kV Substation Project, Georgia
Client:
Betaş Elektrik Taahhüt & Ticaret A.Ş.
Time of work:
2021 - Ongoing
Installed Capacity:
-
Category
Marneuli & Menji Substation Projects, Georgia
Client:
Betaş Elektrik Taahhüt & Ticaret A.Ş.
Time of work:
2015 - 2017
Installed Capacity:
-
Category
Khelvachauri-I and Kırnati Weirs & HPPs, Georgia
Client:
Achar Enerji 2007 Ltd. (Eksim Yatırım Holdingi A.Ş.)
Time of work:
2013 - 2014
Installed Capacity:
-
Category
Oni Cascade Project, Georgia
Client:
JSC Partnership Fund
Time of work:
03/2013 – 07/2013
Installed Capacity:
Oni 1: 2x62.50MW/2x21m3/s, Oni 2: 3x45.9 MW/3x33.33 m³/s, Garula: 2x6.20MW/2x15m³/s
Category
Nenskra HPP, Georgia
Client:
JSC NENSKRA
Time of work:
2012 - 2015
Installed Capacity:
210MW
Category
Shuakhevi Dam & HPP, Georgia
Client:
International Finance Corporation (IFC) - Adjaristsqali Georgia LLC / Georgia (Together with Lahmeyer International)
Time of work:
2013 - 2017
Installed Capacity:
175MW
Category
Paravani Weir & HPP, Georgia
Client:
Georgian Urban Energy Ltd.
Time of work:
2011 - 2014
Installed Capacity:
86.54MW/25 m³/s
Category
Deralok Diversion Weir & HPP, Iraq
Client:
Sanayi ve Elektrik Bakanlığı Kürdistan Bölge Valiliği ERBİL IRAK
Time of work:
06-2005/11-2005
Installed Capacity:
32MW
Category
Gökırmak Mine Site River Diversion Project, Turkey
Client:
Acacia Maden İşletmeleri A.Ş.
Time of work:
2013-2015
Installed Capacity:
-
Category
Orhaneli Creek Diversion Project, Turkey
Client:
Eti Maden İşletmeleri A.Ş.
Time of work:
2014-2017
Installed Capacity:
-
Category
Bağdere Tailings Dam, Turkey
Client:
Acacia Mining Operations
Time of work:
2020-2022
Installed Capacity:
-
Kepezkaya Tailings Dam, Turkey
Client:
Acacia Mining Operations
Time of work:
2015 - 2019
Installed Capacity:
-
Hisarcık Tailings Dam, Turkey
Client:
Eti Maden İşletmeleri General Directorate
Time of work:
2013 - 2014
Installed Capacity:
-
Espey Tailings Dam, Turkey
Client:
Eti Maden İşletmeleri General Directorate
Time of work:
2013 - 2014
Installed Capacity:
-
Kargı Dam & HPP Hydrology Assessment Report, Tu...
Client:
Şekerbank T.A.Ş.
Time of work:
08/2019 – 12/2019
Installed Capacity:
103.8 MW/167 m³/s
Category
Serhat HPP, Turkey
Client:
Şekerbank T.A.Ş.
Time of work:
2013-2016
Installed Capacity:
9.10 MW/4 m³/s
Category
Demir Weir & HPP, Turkey
Client:
Şekerbank T.A.Ş.
Time of work:
2015-2015
Installed Capacity:
4.01 MW/6.5 m³/s
Category
Özlüce HPP, Turkey
Client:
Türkiye İş Bankası A.Ş.
Time of work:
2011 – 2014
Installed Capacity:
37.50 MW/9 m³/s
Category
Kuzey I – II Weirs and HPP, Turkey
Client:
Yapı Kredi Bankası A.Ş.
Time of work:
2015 - 2017
Installed Capacity:
5.78 MW / 11 m³/s
Category
Sakarya Basin Master Plan Report Preparation Se...
Client:
State Hydraulic Works 3rd Regional Directorate
Time of work:
2013 - 2018
Category
Fırat Sub-Basin Preparation of Master Plan Rep...
Client:
General Directorate of State Hydraulic Works
Time of work:
2015 - 2018
Installed Capacity:
-
Category
Gediz Irrigation Rehabilitation Planning Revisi...
Client:
State Hydraulic Works (DSI), 2nd Regional Directorate
Time of work:
2014 - 2017
Category
Konya Çumra 2-B Project Beyşehir, Seydişehir Pu...
Client:
State Hydraulic Works IV. Regional Directorate, Konya
Time of work:
2017 - Ongoing
Category
Aşağı Çekerek Project Irrigation Detailed Desig...
Client:
Devlet Su İşleri XXII. Bölge Müdürlüğü
Time of work:
2014 - 2016
Installed Capacity:
24.241 ha
Category
Aşağı Alıçlı Dam Irrigation Detailed Design, Tu...
Client:
Devlet Su İşleri XXII. Bölge Müdürlüğü
Time of work:
2006 - 2009
Category
Antalya Finike Irrigation Renovation Project, T...
Client:
Devlet Su İşleri XIII. Bölge Müdürlüğü
Time of work:
2016 - Ongoing
Category
Erzincan Turnaçayırı Dam Irrigation, Turkey
Client:
General Directorate of State Hydraulic Works
Time of work:
2014-2020
Category
Köse Dam Irrigation Detailed Design, Turkey
Client:
General Directorate of State Hydraulic Works
Time of work:
2005 - 2011
Installed Capacity:
5079 ha
Category
Kahramanmaraş Adatepe- Karakuz Irrigation, Turkey
Client:
State Hydraulic Works XX. Regional Directorate
Time of work:
2008 – 2013
Category
Kızılırmak Basin Flood Management, Turkey
Client:
Ministry of Agriculture and Forestry, General Directorate of Water Management
Time of work:
2016 - 2019
Category
Mersin Gülnar Sipahili Dam and Irrigation, Turkey
Client:
General Directorate of State Hydraulic Works
Time of work:
2010 - 2012
Category
Yamula Project Kalaba-Seyfe Group Irrigation Pl...
Client:
General Directorate of State Hydraulic Works
Time of work:
2004 - 2006
Category
Adıyaman Büyükçay Dam and Irrigation, Turkey
Client:
General Directorate of State Hydraulic Works (DSI)
Time of work:
2012 - 2018
Category
Kayseri Bahçelik Dam Irrigation Planning and D...
Client:
State Hydraulic Works XII. Regional Directorate
Time of work:
2001 - 2011
Category
Erikli-Akocak Weirs and Akocak & HPP, Turkey
Client:
Akenerji Elektrik Üretim A.Ş.
Time of work:
2005 - 2010
Installed Capacity:
82.86 MW /12.30 m3/s
Category
Kale Weir & HPP, Turkey
Client:
Avkal Enerji Üretim ve Ticaret A.Ş.
Time of work:
2011 - 2013
Installed Capacity:
36MW/110.0m3/s
Category
Karıca Weir & Darıca I HPP, Turkey
Client:
Yapısan Elektrik Üretim A.Ş.
Time of work:
2007 - 2009
Installed Capacity:
99 MW/36.0 m3/s
Category
Cevizlik Weir & HPP, Turkey
Client:
Akım Enerji Üretim San. Tic. AŞ (Sanko Energy Group Firm)
Time of work:
2005- 2010
Installed Capacity:
95 MW/49.50 m3/s
Category
Dağdelen Weir & HPP, Turkey
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2010-2013
Installed Capacity:
8.32MW/64.8m3/s
Category
Çambaşı-Ögene Weirs & Çambaşı HPP, Turkey
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2007-2013
Installed Capacity:
45 MW/20.0m3/s
Category
Hacınınoğlu Weir & HPP, Turkey
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2007-2011
Installed Capacity:
144.40MW/120.26m3/s
Category
Bucakkışla Weir & HPP, Turkey
Client:
Yapısan Electricity Generation Inc.
Time of work:
2010-2014
Installed Capacity:
34.54MW / 38.70m3/s
Category
Bulam Weir & HPP, Turkey
Client:
MEM En. El. Ür. San. ve Tic. AŞ
Time of work:
2007-2010
Installed Capacity:
7.03MW / 5.2 m3/s
Category
Koçlu Weir & HPP, Turkey
Client:
İyon Enerji Üretimi Sanayi ve Ticaret A.Ş. (Sanko Energy Group )
Time of work:
2008-2014
Installed Capacity:
37.02MW/16.0m3/s
Category
Çarşamba Weir & HPP, Turkey
Client:
Çarşamba Enerji Elektrik Üretim A.Ş
Time of work:
2008-2013
Installed Capacity:
11.778MWm/210m3/s
Category
Yamanlı III – Himmetli Weir & HPP, Turkey
Client:
MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş
Time of work:
2007-2012
Installed Capacity:
27.9 MW/55.0m³/s
Category
Feke-II Dam & HPP, Turkey
Client:
Akkur Enerji Üretim Ticaret ve Sanayi AŞ
Time of work:
2007-2010
Installed Capacity:
71.4 MW/127.5m3/s
Category
Uluabat Power Tunnel & HPP, Turkey
Client:
Akenerji Elektrik Üretim AŞ
Time of work:
2005- 2010
Installed Capacity:
100 MW
Category
Yokuşlu-Kalkandere HPP, Turkey
Client:
Sanko Holding
Time of work:
2007-2010
Installed Capacity:
35.79 MW/50.0 m³/s
Category
İkizdere Weir & HPP Rehabilitation, Turkey
Client:
Zorlu Doğal Elektrik Üretimi A.Ş.
Time of work:
2015 - 2018
Installed Capacity:
25.78 MWm+24.94 Mwe
Category
Diyarbakır-Ergani Dam, Turkey
Client:
General Directorate of State Hydraulics Works
Time of work:
2009 – 2010
Installed Capacity:
-
Category
Kars-Digor Project Varlı Dam & HPP, Turkey
Client:
General Directorate of State Hydraulics Works
Time of work:
2013-2015
Installed Capacity:
89.12 m³/s
Category
Karareis Dam & HPP, Turkey
Client:
State Hydraulics Works (DSI), 2nd Region
Time of work:
2011 – 2016
Installed Capacity:
-
Category
Kargı Dam & HPP, Turkey
Client:
Statkraft Inc., Norway, (Kargı Kızılırmak Enerji A.Ş.)
Time of work:
2011-2013
Installed Capacity:
103.8 MW/167 m3/s
Category
İncir Dam & HPP, Turkey
Client:
Enerjisa Enerji Üretim A.Ş.
Time of work:
2012-2013
Installed Capacity:
172MW/137.5m3/s
Category
Burç Dam & HPP, Turkey
Client:
Akkur Enerji Üretim Ticaret ve Sanayi A.Ş. (Akenerji subsidiary)
Time of work:
2007- 2010
Installed Capacity:
27.90 MW/33.20m3/s
Category
Yamanlı III - Gökkaya Dam & HPP, Turkey
Client:
MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş (Akenerji subsidiary)
Time of work:
2007-2012
Installed Capacity:
29.46 MW/51.0 m³/s
Category
Kemah Dam & HPP, Turkey
Client:
Ak-El Kemah Elektrik Üretim A.Ş. (Akenerji subsidiary)
Time of work:
2012- 2015
Installed Capacity:
139.94 MWm + 58.7MWm
Category
Tepekışla Dam & HPP, Turkey
Client:
Ark Enerji A.Ş. (Sanko A.Ş.)
Time of work:
2011 – 2015
Installed Capacity:
68.85MWm/213.0 m3/s
Category
Upper and Lower Çetin Dam & HPPs, Turkey
Client:
Çetin Enerji A.Ş. (Statkraft)
Time of work:
2013 – 2017
Installed Capacity:
420 MW/ 347.2 m3/s
Category
Sanibey Dam & HPP, Turkey
Client:
Yedigöze Elektrik Üretim ve Ticaret AŞ (Sanko A.Ş.)
Time of work:
2007-2010
Installed Capacity:
318.0 MW/187.5 m3/s
Category
Yamula Dam & HPP, Turkey
Client:
Kayseri Elektrik Üretim Sanayi ve Ticaret A.Ş.
Time of work:
2002-2005
Installed Capacity:
100 MW/103.20 m3/s
Category
Sarıgüzel Dam & HPP, Turkey
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2007-2014
Installed Capacity:
100.80MWm+3.76MWm/101m3/s
Category
Karakurt Dam & HPP, Turkey
Client:
Energo-Pro (BİLSEV Enerji Üretim ve Ticaret A.Ş.)
Time of work:
2015-2020
Installed Capacity:
99.50 MWm
Category
Kandil Dam & HPP
Client:
Enerjisa Enerji Üretim A. Ş. (Verbund)
Time of work:
2007-2014
Installed Capacity:
206.60MWm + 4.88MWm/107.7m3/s
Category
Alpaslan II Dam & HPP, Turkey
Client:
Energo-Pro (Murat Nehri Enerji Üretim A.Ş.)
Time of work:
2017 - 2020
Installed Capacity:
2x110 + 2x30 MW
Category